After a delicious breakfast, we divided into 2 teams, and took a 45 minute drive up into the mountains to begin our work. The families for whom we were working today spent the last 2 weeks making the necessary cement blocks and bricks we would need to make the stoves and latrines. Upon our arrival we had brief introductions and immediately got to work. The homes are very, very simple with dirt floors, brick walls, and tin roofs. We were divided into 4 groups, 2 working on stoves, and 2 on latrines. We used circular saws, machetes, mixed multiple batches of cement by hand, measured and cut brick with a machete, dug holes, pounded nails, and everyone worked really hard. The children of the families worked right along side us. Boys and girls 4-8 years old were hauling bricks, mixing cement, and everything else, smiling the whole time. We smiled right along with them! Through our work we began to connect with the children, and by the en...